Sokcho market bakery half-and-half egg tart set: Doris Patisserie
In short
Doris Patisserie is a hot pink egg tart bakery in an alley of Sokcho Central Market in Gangwon. The order was a half-and-half egg tart set of 6 plus a mix-and-match box of financiers and madeleines, paid with Onnuri gift certificates, Zero Pay and Sokcho Love gift certificates; boxes of 6 run 15,000 to 18,000 won. With crackly pastry and pudding-soft custard, Doris Patisserie is the dessert stop to build into a Sokcho Central Market visit.

Good to know
- Original egg tart
- 15,000 won for a box of 6
- Cream cheese egg tart
- 16,800 won for a box of 6
- Walnut egg tart
- 16,800 won for a box of 6
- Half-and-half set
- Original/cream cheese/walnut combos, 15,900–16,800 won
- Financiers & madeleines
- 18,000 won for a mix-and-match box of 6
- Selling rounds
- 3–4 times a day, including 10am, 12pm and 3pm
- Reservations
- By text from 6am the day before pickup, in boxes of 6
- Payment
- Onnuri, Zero Pay and Sokcho Love gift certificates accepted
- Parking
- Paid parking lot near the shop
as written by the visitor on Sep 18, 2026
When planning a trip to Sokcho, the lively Sokcho Central Market is an absolute must! Sure, classic snacks like dakgangjeong (sweet crispy fried chicken) or seed hotteok (sweet pancake) are always great, but lately there's a special Sokcho bakery blowing up on social media among dessert lovers. I went to check out Doris Patisserie, famous for egg tarts with pastry so flaky it rivals what you'd find in Portugal!

Where is Doris Patisserie in Sokcho Central Market?
Doris Patisserie is an egg tart specialty shop with a hot pink exterior, tucked in an alley near Sokcho Central Market. As soon as you turn into the alley near the market, that lovely hot pink facade catches your eye from far away. In front of the charming, bright building that feels like a European bakeshop, a long line of customers waiting for freshly baked desserts had already formed.

What time are the daily baking rounds?
Doris Patisserie operates 3–4 sales rounds a day, timed to their baking schedule. The glass window at the entrance kindly lists the times for each round — set slots like 10am, 12pm, and 3pm.

Reading the detailed operating notice, I learned that for each round, reservation pickups are handled first, and only the remaining stock is sold to walk-ins in line order. Once the prepared quantity sells out, that round closes immediately — so knowing this tip is essential if you don't want to make a wasted trip!

How to text a reservation the day before
Here's a top-tier reservation tip! If you don't want to miss out on the flavor you want, I highly recommend texting a reservation the day before. Starting at 6am the day before pickup, you can text the listed number to order in boxes of 6, and pick up safely without waiting in line.

For reserved pickup, it's convenient to use the paid parking lot near the store. Just give the last 4 digits of your reservation phone number and you can quickly grab your warm, freshly baked tarts.

Inside the Doris Patisserie shop
Walking in with excitement, a nutty, sweet butter aroma pleasantly tickled my nose. The bright mint-tiled counter and the crystal chandelier sparkling on the ceiling add a touch of luxury to the space.

On one side of the counter sits a vintage pink espresso machine that perfectly matches the shop's vibe — total eye-catcher!
Doris Patisserie egg tart menu and prices
So you don't have to dig through the online menu yourself, here's a clean summary of the most popular lineup!
[ DORIS PATISSERIE SIGNATURE MENU ] Original Egg Tart (box of 6) - ₩15,000 · The classic: crispy pastry and moist custard! Cream Cheese Egg Tart (box of 6) - ₩16,800 · A cheese lover's top pick, soft and rich Walnut Egg Tart (box of 6) - ₩16,800 · Loaded with nutty, crunchy walnuts Half-and-Half Set (original/cream cheese/walnut combos) - ₩15,900 ~ ₩16,800 Financiers & Madeleines, choose 6 - ₩18,000
We went with the most popular half-and-half egg tart set, plus a mix of baked snacks.

Paying with Onnuri gift certificates and Zero Pay
At checkout, I noticed you can use Onnuri gift certificates, Zero Pay, and even Sokcho Love gift certificates — great for saving a bit while enjoying the discounts.

They're also running an event where you get a free tart or financier for leaving a photo review on Naver receipt reviews or Google reviews — definitely a deal worth grabbing!

Open kitchen and the baked-sweets showcase
While waiting for our order, I peeked inside and saw a professional pâtissier carefully packing tarts in the open kitchen.

The work station and stainless tools were spotless and gleaming, so my food-safety confidence shot up 200%.

The glass showcase was packed with golden, gleaming baked snacks!

From plump vanilla, lemon, and Earl Grey madeleines to fig cream cheese, pistachio, and gold cheese varieties — you could tell at a glance each one was made with generous, no-holds-barred ingredients. This is a Sokcho bakery that will make any serious dessert lover's eyes light up.

How does the half-and-half box of 6 taste?
Ta-da! The moment I'd been waiting for — unboxing the egg tart box of 6! Layers of thin, flaky pastry crust with golden, caramelized custard cream on top made for a stunning sight. Taking a big bite while still warm, there's a satisfying 'crackle!' and the pudding-soft filling melts inside your mouth — truly moving. There's no greasiness at all, just a perfect balance of eggy savoriness and gentle sweetness. Confirmed: this is one of the best things to eat at Sokcho Central Market, loved by all ages!

How to store and reheat leftover egg tarts
Inside the box, there were detailed instructions on how to enjoy the tarts at home — a nice touch. Eating them crisp on the day of purchase is best, but for leftovers, just 2-3 minutes at 180°C in an air fryer or oven brings back that fresh-baked texture! Freezing them and letting them thaw slightly for an ice-cream-like treat is also a fun, different way to enjoy them.
The cheerful pink packaging also makes these great as a travel souvenir gift, and that unforgettable crackly texture will stay with you long after your first bite! If you're looking for a real Sokcho egg tart spot during your trip, be sure to stop by Doris Patisserie, a must for dessert at Central Market!
Which would you reach for first — the soft original custard or the thick, rich cream cheese tart? Leave a comment and share your dessert preference! 😊
Where it is
26 Jungang-ro 147beon-gil, Sokcho-si, Gangwon-do, South Korea, 1st floor Doris Patisserie강원특별자치도 속초시 중앙로147번길 26 1층 도리스 파티세리







