Yeouido private yacht charter on the Mermaid boat: Sailing Paradise

In short

Sailing Paradise is a Han River yacht tour operator inside Hanriver Paradise at Yeouido Hangang Park in Yeongdeungpo, Seoul. To surprise her younger sister, who had never been on a yacht, the writer booked a 7 pm weekday private tour on a weekday after work and brought white wine and snacks, cruising the Han River from sunset into the night views. Even the cheapest private boat, the Mermaid, costs 300,000 won for exclusive use, which makes Sailing Paradise a workable choice for a surprise event or an anniversary.

Main photo of a private Han River yacht tour with Sailing Paradise in Yeouido

Good to know

Hours
Daily 10:00–22:00
Location
Sailing Paradise, inside Hanriver Paradise, 252 Yeouidong-ro, Yeongdeungpo-gu, Seoul (Yeouinaru Station, Subway Line 5, Exit 3)
Parking
Paid parking available (Yeouido Hangang Park Parking Lot 1)
Pets
Not allowed
Reservations
Bookable on Naver; reserve 1–2 weeks ahead
Price
Standard yacht tour: 30,000–50,000 won per adult
Private yacht
Mermaid, the cheapest boat, 300,000 won
Visitor tip
Arrive at least 10 minutes early to fill out the boarding declaration form
Price reference
₩30,000 ≈ $22.5 · ₩50,000 ≈ $37 · ₩300,000 ≈ $223 (2026-09-15)

as written by the visitor on Sep 13, 2026

Main photo of a private Han River yacht tour with Sailing Paradise in Yeouido

A Han River yacht date recommendation in Seoul — my private tour review of Sailing Paradise. Written and photographed by Yuni

My sister and I hadn't hung out in a while, so I lured her to the Han River with the promise of ramyeon. Turns out she'd never been on a yacht before, so I secretly arranged a surprise for her — a private tour at Sailing Paradise, famous as a Han River yacht date spot in Seoul.

Sailing Paradise: location, hours and booking basics

  • Hours: Daily 10:00–22:00
  • Location: Sailing Paradise, inside Hanriver Paradise, 252 Yeouidong-ro, Yeongdeungpo-gu, Seoul (Yeouinaru Station, Line 5, Exit 3)
  • Parking: Paid parking available
  • Info: Pets not allowed, Naver Reservations available
View of Hanriver Paradise near the 63 Building in Yeouido Hangang Park

1. Where Sailing Paradise is and where to park

Sailing Paradise is located at Hanriver Paradise near the 63 Building in Yeouido Hangang Park, Seoul. It's known as a top Han River yacht date spot.

Sailing Paradise sign at the entrance of Hanriver Paradise

There's a Sailing Paradise sign right at the entrance of Hanriver Paradise, so it was easy to find even on my first visit haha~

Paid parking available

I met my sister right after work and we just walked over from the office to the Han River park, but if you're driving, there's 🅿️ Yeouido Hangang Park Parking Lot 1 right nearby, so you can park there directly!

Various yachts docked at Sailing Paradise

2. How much a Han River yacht tour costs and how to book

Sailing Paradise's general yacht tours run ₩30,000 to ₩50,000 per adult, while the private tour starts at ₩300,000 for the cheapest boat, the Mermaid. Book through Naver Reservations, ideally 1–2 weeks in advance.

The yacht tours I'd been on before were all the type where multiple people share one boat out at sea, but the great thing about Sailing Paradise's Han River yacht tour is that they run all kinds of boats — small, medium, large, and even sailing yachts!

Proposals and wedding photo shoots on board

Like our tour, a private tour is also great for marking special occasions like proposals or wedding photoshoots.

Parties and private events on the yacht

They also have large yachts that can host onboard parties, so you can rent one out for all kinds of events~

Sailing Paradise pricing

Honestly, before trying a yacht tour I worried it'd be pricey, but at ₩30,000–₩50,000 per adult, it's completely affordable!

Sailing Paradise yacht tour pricing information

Of course, the private yacht tour costs a bit more than the general one, but even the cheapest Mermaid boat lets you enjoy a private Han River yacht tour for ₩300,000, with add-ons like proposal setups or catering — perfect for an anniversary or surprise event!! 👍👍👍

How to book

You need to book 1–2 weeks ahead, but Sailing Paradise at Yeouido Hangang Park, a great spot for a Han River yacht date in Seoul, is easy to reserve through Naver Reservations!

Yacht dock at Yeouido Hangang Park at sunset

3. What the Mermaid private tour was like

I work in Yeouido but always rush home after work, so I wasn't very familiar with the Hangang Park — but the owner came out to greet us at the entrance, so we didn't get lost at all. Big plus for Sailing Paradise.

Interior of the Sailing Paradise reception area
Area for filling out the boarding declaration form before boarding

Filling out the boarding declaration form

You need to fill out a boarding declaration form before getting on the yacht, so arriving with at least 10 minutes to spare is a must!

Waiting seats at Sailing Paradise with a view of the Han River

Is there a waiting area before boarding?

I clocked out right at 6 and rushed over, so we had a lot of time to spare — but there's such a nicely styled waiting area that it was great just relaxing there while looking out at the Han River ^.^

View of the Han River from the waiting area

Following the owner's lead toward the boarding area, I was amazed by how many different yachts there were, from large to small!!!

Pier with yachts ranging from large to small

And this is the one we boarded!

Exterior of the white-toned private yacht boarded for the tour
Seating on the white-themed yacht
Deck space on the private yacht

A clean, all-white yacht that would be perfect for couples on a Han River date in Seoul combined with a yacht tour, but also great for spending special time with family like I did! 😘

Sunset over Yeouido Hangang Park seen from the yacht

The 7 pm slot: sunset over the 63 Building

I deliberately booked 7 pm because I wanted to catch the sunset — and the sky turning pink over the 63 Building and Yeouido Hangang Park was so beautiful.

Pink sunset sky over the 63 Building

They also served white wine, cider, and some light snacks

White wine, cider, and snacks served on the yacht

which totally hit the spot for us sisters who love low-alcohol, sweet drinks 🍷

Wine glasses on the deck table during a Han River sunset
Yacht deck against a sunset-lit Han River backdrop

As the sun sank further west, the whole atmosphere got even more romantic — Sailing Paradise's private Han River yacht tour date in Seoul, at its best ✨

The sun setting over the Han River and Seoul skyline
Night views of the Han River felt through the breeze
Seoul night skyline captured from the yacht

It was my first time on a yacht tour on the Han River, and watching the Seoul night views while the breeze gently blew was pure romance.

Sunset reflecting on the Han River water beside the yacht railing

Best photo spot: the National Assembly Building

While we were just gasping 'wow, so pretty' at the sunset, the captain pointed out the photo spot for the National Assembly Building, known as Seoul's 'Manhattan' — and we got lucky with some amazing shots 📷

Night view of the Han River lit up, seen from the yacht deck

As the sky darkened, the lights turning on matched the mood perfectly — Sailing Paradise's Han River yacht tour in Seoul was full of feeling and romance right to the very end.

Would I book a sisters' yacht date at Sailing Paradise again?

Seeing my sister so happy made me happy too — this private Han River yacht tour date with my sister at Sailing Paradise in Seoul. Watching Seoul's night skyline from the water felt so unique, romantic, and healing that I'd want to come back with my parents or a partner for an anniversary. If you're looking for a unique yet romantic date course in Seoul, I'd recommend the private Han River yacht tour at Sailing Paradise!

Where it is

Sailing Paradise세일링파라다이스

252 Yeouidong-ro, Yeongdeungpo-gu, Seoul, South Korea (inside Hanriver Paradise)서울특별시 영등포구 여의동로 252 한강파라다이스내 세일링파라다이스

Open in Google Maps

Local places · Things to do